TEST  Test Dates D J F M A M J J A S O N D J F
InSitu-AS2 Development
*for non-InSitu enabled AS2 ITQ SP products entering AS2-1Q08
Dec 8-19, 2008 and continued  Jan 5-Feb 20, 2009 X X X                        
AS1 Interop 5/27– 6/12           X X                
AS3 Interop   1/5 – 2/20   X X                        
AS3 ITQ on demand X X X X X X                  
InSitu-AS3  Development *Mandatory for entering 2010 AS3 Interop test 11/17 - 12/19,
6/1 - 6/30
            X                
AS2 QA *2 separate rounds of AS2-QA in 2009, each lasting 3 wks 3/9 - 4/3
8/31 - 9/25
 
    X X         X X          
AS2 Interop: AS2-1Q09
CEM (3/2 - 3/13)
Reliability (3/16 - 3/27)
FN MDN (3/30 - 4/3)
Required (4/6 - 5/22)
3/2 – 5/22       X X X                  
AS2: AS2 Profiles ITQ: AS2-3Q09
CEM ITQ (6/8 – 8/14)
FN ITQ (7/20 – 7/31)
FN MDN ITQ (FSTC MDN) (8/3 – 8/21)
Reliability ITQ (6/08 – 8/21)
Chunked Transfer (6/08-8/21)
MA ITQ (8/10 – 8/21)
  6/8 - 8/21
Must Register for profiles by 5/29/09
 
              X X X          
AS2 Interop: AS2-3Q09
CEM (8/24 - 9/4)
Reliability (9/7 - 9/18)
FN MDN (9/21 - 9/25)
Required (9/28 - 11/20)
  8/24 - 11/20
(FN, MA, Chunked Transfer runs during "Required")
 
                  X X X X    
AS2 ITQ Self Paced RELEASED
*For new products entering AS2-3Q09.  Must also complete InSitu-AS2 by 6/29
1/7 – 5/9   X X X X X                  
AS2 ITQ Self Paced RELEASED *entering AS2-1Q10 8/10 – 12/04                 X X X X X    

TEST

 Test Dates

D

J

F

M

A

M

J

J

A

S

O

N

D

J

F

AS2 ITQ Self Paced RETURN (for AS2-1Q09)

 

1/07 – 2/20

 

X

X

 

 

 

 

 

 

 

 

 

 

 

 

AS2 ITQ Self Paced RETURN *entering AS2-3Q09. Must be InSitu enabled to enter.

 

5/04 -6/26

 

 

 

 

 

X

X

 

 

 

 

 

 

 

 

AS2 ITQ Self-Paced RETURN*entering AS2-1Q10. Must be InSitu enabled to enter.

1/11/10– 2/20/10

 

 

 

 

 

 

 

 

 

 

 

 

 

X

X

AS2 ITQ Self Paced DEVELOPMENT

On Demand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

InSitu-AS2 *for non-InSitu enabled AS2 ITQ SP products entering AS2-3Q09 5/11 – 6/29           X X X              
InSitu-AS2 *for non-InSitu enabled AS2 ITQ SP products entering AS2-1Q10 Dec. 7-18, 2009 continued Jan 5 – Feb.19, 2010                         X X X

ebMS 2.0 ITQ

 

8/24 – 10/09

 

 

 

 

 

 

 

 

X

X

X

 

 

 

 

ebMS 2.0 Interop

10/26 –12/18

 

 

 

 

 

 

 

 

 

 

X

X

X

 

 

AS4 DEV ITQ (1Q09)

Oct '08 - Feb '09

X

X

 

 

 

 

 

 

 

 

 

 

 

 

 

AS4 Interop 1Q09

March 2009

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

AS4 DEV ITQ 2Q10

Sept 2009 – Jan 2010

 

 

 

 

 

 

 

 

 

X

X

X

X

X

 

SAML 2.0

7/14 – 9/04

 

 

 

 

 

 

 

X

X

X

 

 

 

 

 

CSOS

Upon demand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GDSN – KATO

2Q09 - TBA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

Note:  These test end dates are estimates. DGI reserves the right to modify the schedule as circumstances warrant. If you are planning manpower requirements, please contact the test lead for more specific timing.